navbar_fullbar6

 standard_menu_email ---> TOC

y2k_survey_icon
y2k_icon1
csrma_connect_zline

CSRMA Y2K Preparedness Survey

Facility Name:

 

Contact Name:

 

Lab Services  

1.

Have all lab PCs been verified to be Y2K compliant?

 

2.

Have all applications used on lab PCs been verified to be Y2K compliant?

 

3

Have any Lab Information Management Systems being used been verified to be Y2K compliant?

 

4

Have all contract labs that are used been verified to be Y2K compliant?

 

5

Are other contract labs identified for use in case your primary contract lab fails?

 

6

Have all microprocessor-controlled lab equipment been verified to be Y2K compliant?

 

7

Have all microprocessor-controlled samplers been verified to be Y2K compliant?

 

8

Has the lab developed a Y2K contingency plan?

 

9

Does the lab have any microprocessor –controlled safety equipment?

 

10

Are databases containing historical data routinely backed up?

 

Industrial Waste/ Source Control 

1

Have all industrial users with pretreatment systems been identified?

 

2

Has consideration been given to IU pretreatment failure and the impact this might have on plant processes and employee safety?

 

3

Have IU's been queried on their Y2K compliance?

 

4

Have IU's that rely on chemical deliveries for pretreatment identified backup suppliers?

 

5

Have IU databases and permit tracking systems been verified for Y2K compliance?

 

General

1

Do you use Microsoft Access?

 

2

Do you use Microsoft Excel?

 

3

Do any of your computer systems use Unix software?

 

4

Has the phone system been verified to be Y2K compliant? 

 

5

Has the HVAC system been verified to be Y2K compliant?

 

6

Are there plans to drill various departments on their Y2K contingency plans?

 

7

Do you have a written Y2K Compliance Plan?

 

8

Have funds been budgeted for outside Y2K consultants?

 

9

What percentage of vendors have responded to your Y2K compliance queries?

 %

Plant Safety Systems  

1

Have all continuous atmospheric monitoring equipment been verified to be Y2K compliant?

 

2

Have all hand-held gas meters been verified to be Y2K compliant?

 

3

Have the alarm systems linked to atmospheric monitors been verified to be Y2K compliant?

 

4

Have all intrusion alarms been verified to be Y2K compliant?

 

5

Have all lighting systems on timers been verified to be Y2K compliant?

 

Office

1.Have the following been verified for Y2K compliance: 

 

 

a

Copiers

 

b

PCs

 

c

Fax Machines

 

d

Time Clocks

 

e

Door Locks

 

f

Security System

 

g

Sprinkler System

 

h

Safes and Vaults

 

i

Elevators

 

j

Fire Alarm

 

k

Burglar Alarm

 

l

Payroll Systems

 

m

Accounting Systems

 

n

Billing Systems

 

Collections

1

Have all computerized line maintenance systems been verified for Y2K compliance?

 

2

Has all line televising equipment been verified for Y2K compliance?

 

3

Have all vehicle mounted microprocessor controlled equipment been verified for Y2K compliance?

 

4. Have all remote pump stations had the following verified for Y2K compliance:

a

Chemical feed delivery systems

 

b

Liquid level alarms

 

c

Pump failure alarms

 

d

Time or flow-based pumps

 

e

Intrusion alarms

 

f

Personnel safety alarms (i.e. atmospheric monitoring)

 

5

Have all vendors that supply chemicals to pump stations been verified for Y2K compliance?

 

6

Have generators been tested to see if they will automatically engage during an outage after 1/1/2000?

 

7

Is there at least three days worth of fuel during a peak load on hand at each pump station?

 

8

Have alternate fuel vendors been identified?

 

9

Have alternate chemical suppliers been identified?

 

10

Have contingency plans been drafted to deal with possible pump station failures?

 

Plant Maintenance 

1

Have all computerized preventative maintenance programs been verified for Y2K compliance? 

 

2

Have all microprocessor-controlled processes for the following been verified for Y2K compliance?  

a

Pumps

 

b

Liquid level indicators

 

c

Process compliance alarms

 

d

Flow meters

 

Operations  

1

1. Have all the systems and components that feed information into the SCADA system been identified?  

 

2

2. Has the SCADA system and all its subsystems been verified for Y2K compliance?

 

3

3. Have contingency plans been drafted to deal with possible plant process failures? 

 

4

3. Will computerized process monitoring systems be manually verified periodically after 1/1/2000? 

 

5

4. Does the plant have at least five days worth of backup fuel under peak load  on hand?

 

6

5. Have critical chemical suppliers been verified for Y2K compliance?

 

7

6. Have alternate chemical suppliers been identified?

 

8

7. Have biosolids haulers been verified for Y2K compliance?

 

9

8. Has your biosolids disposal facility been verified for Y2K compliance?

 

10

9. Have your hazardous waste transporters been verified for Y2K compliance?

 

11

10. Has the TSDF that accepts your hazardous waste been verified for Y2K compliance?  

 

12

11. Are historical records routinely backed up to tape or cdrom?

 

13

12. Have all microprocessor-controlled equipment involved in biogas collection, consumption and storage been identified?